Rolling Factory VIP Building
Location: El Kalyobya, Egypt
Project Type: Administrative Building
Owner: Military Production Ministry
Employer: Abu Zaabal Engineering Industries Company.
Consultant: DSC international.
Value: 18.5 million ُEgyptian Pound
Duration: 7 months
Completion Date: March 2006
Assignment:
Our assignment as SHUTTERING CONSTRUCTION COMPANY was a turnkey project. It included excavation ,concretes, finishing works included (wood, gypsum, brick works, marble, tiling, etc.), fixed joinery, doors, special wood works and paneling, aluminum composite elevations, aluminum curtain walls all electro-mechanical works (HAVC, electric, fire alarm, fire fighting,plumping, telephone and state of the art IT), water storage grounds tanks (fire & drinking water).