Administrative Buildings

Steel structure companies in Egypt

Assignment:

Our assignment as SHUTTERING CONSTRUCTION COPMANY was the completion of concrete skeleton and all finishing works of one basement with an area 2400 m2, ground floor and 2 typical floors each with an area of 2400 m2 including facades finishes (Structural glazing, Alum Cladding), marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, and all electro-mechanical works (HAVC, electric wiring, fire alarm, fire fighting, plumping).

Location:

Egypt

Engineering companies in Egypt

Assignment:

Our assignment was the completion the concrete skeleton and all finishing works of the one basement of 3500 m2 including facades finishes (structural glazing, Stone Cladding), Marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, and all electro-mechanical works (HAVC, electric, fire alarm,fire fighting, plumping, telephone and data).

Location:

Egypt

Construction company in Egypt

Assignment:

Our assignment was the finishing works of the floors including ceilings (wood, gypsum, brick works, marble, tiling, etc.), fixed joinery, doors, special wood works and paneling, all electro-mechanical works (HAVC, electric, fire alarm, fire fighting, plumping, telephone and data).

Location:

Egypt

Steel structure companies in Egypt

Assignment:

Our assignment was the execution of the concrete skeleton and finishing works of the two basement of 4000 m2 and four typical floors of area 1200 m2 including facades finishes (structural glazing, Aluminum Cladding), marble pattern flooring, ceilings (wood, gypsum, etc.), fixed joinery, doors, and all roof layers finishes, also all electro-mechanical works (HAVC, electric, fire alarm, fire fighting, plumping, telephone and data). 

Location:

Egypt

Engineering companies in Egypt

Assignment:

Our assignment as shuttering was to execute the concrete skeleton and all finishing works. In addition to the electromechanical and elevators works. The building cover an area of 1500 m2.

Location:

Egypt

Steel structure companies in Egypt

Assignment:

Our assignment as SHUTTERING CONSTRUCTION COMPANY was a turnkey project. It included excavation ,concretes, finishing works included (wood, gypsum, brick works, marble, tiling, etc.), fixed joinery, doors, special wood works and paneling, aluminum composite elevations, aluminum curtain walls  all electro-mechanical works (HAVC, electric, fire alarm, fire fighting,plumping, telephone and state of the art IT), water storage grounds tanks (fire & drinking water). 

Location:

Egypt