Other Projects

Contracting companies in Egypt

Assignment:

Our assignment as SHUTTERING CONSTRUCTION COMPANY was to execute the VIP Airport lounge with high level  quality control. The scope included all civil and architecture works, electro-mechanical works and landscape. The project consisted of one building with a ground floor of total area 2000 m2.

Location:

Egypt

Construction companies in Egypt

Assignment:

The project is a commercial and administrative building (Avaris Commercial Complex) which consist mainly of the following:

1.  Lower Basement and upper basement with an area of 10179 m2 each

2.  3 Buildings with ground, first, second floor with an area of  approximately 4300 m2 each.The project is a turnkey fast track project including civil, architectural and electro-mechanical works.  

Construction company in Egypt

Assignment:

Our assignment as SHUTTERING CONSTRUCTION COMPANY was a turnkey project of a productive facility (TV studios, editing suits, control rooms, equipment rooms, sound control rooms, light control rooms, dimmers, climate control library laboratory, dressing rooms, work shop, storage facilities and satellite transmission station to the Egyptian media production city).Our scope of work also included modifying and installing the studio light system and the cyclorama, specialized noise controlled air-conditioning systems, sound isolation, and sound treatment.

Location:

Egypt

Contracting companies in Egypt

Assignment:

The Project is a fully equipped residential compound on 27 Fadden. The Project consists of different types of four-story residential buildings arranged in five clusters A, B, C, D, E & F with a common continuous basement in addition to a club house.The Work divided into two main parts as Follow:

Construction company in Egypt

Assignment:

Our assignment as Shuttering Construction Company was to construct an Audio Recording Studio. The studio included Audio Recording facility (Music studios, control room, equipment room, sound control rooms, light control rooms and dimmers. Our scope of work included the counters, finishes for floors, walls and ceilings (wood, gypsum, marble, tiling, etc.), fixed joinery, doors, special wood works and paneling, art works and decorative lighting, electrical works and air-conditioning systems (MEP works).

Location:

Egypt

Contracting companies in Egypt

Assignment:

Our assignment as Shuttering Construction Company was a complete renovation of Groppi. The scope of work included loose and fixed furniture, revolving door, kitchen equipment , HVAC works, electrical works, interior and exterior decoration, bathroom public areas, bar, bakery and dining areas.

Location:

Egypt